标准目录:Notice
Foreword
Committee Roster
Correspondence With the PTC Committee
Section 1 - Object and Scope
Section 2 - Terms and Definitions
Section 3 - Guiding Principles
Section 4 - Instrumentation and Methods of Measurement
Section 5 - Computation of Results
Section 6 - Test Uncertainty
Section 7 - Reporting of Results
Nonmandatory Appendices
A - Sample Uncertainty Calculation
B - Sample Ramp Rate Data and Calculation
标准简介:This code provides the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant. It is applicable to all electrical generating facilities, independent of fuel source or prime movers. The load change rate is distinguished by starting from one operating point at steady state condition and transitioning to another. Startup commences at a shutdown condition, or intermediary startup condition, and proceeds to a defined running condition. Shutdown begins at a running condition and proceeds to a shutdown condition or intermediary shutdown condition. Measurements of actual net generation as a function of time are the primary test parameters. Additional data and information will be collected as part of this analysis to determine the long and short term effects of various ramp rates on the equipment and systems in the power plant of interest. This information includes and is not limited to design specifications and actual operating conditions. This Code is applicable to all electrical generating facilities, independent of fuel source or prime movers. This Code is directed at providing guidelines for measuring the machinery impact of controlled transients that are initiated by the operator. It is not the intent of this Code to address uncontrolled transients that may be initiated by system activity such as load rejection or governor response to grid frequency disturbances.
文件格式:纸质版或者PDF电子版(用Acrobat Reader打开)或Word版本doc格式
PDF格式 ASME PTC 70-2009 斜率 免费下载 Word格式 ASME PTC 70-2009 斜率 免费下载免费标准下载
文件大?。?/span> KB
添加时间:2012/11/23
 
本类标准下载排行
 
 
本类最新免费标准
 
友情链接:苹果游戏|华东在线
免费标准下载网 |标准分享网 |联系我们
版权所有:www.www.hzqhds.com   
广东快乐十分